Shower Base Rebuild & Tile Installation
Renovations · Completed Project

Project Overview
This project documents a shower base after the existing floor was opened for repair. The work progressed through subfloor reconstruction, drain preparation, waterproofing, a new sloped mortar bed, and installation of a new tiled shower floor.
Work Completed
- Shower-base removal and access
- Subfloor and drain-area repair
- Drain preparation
- Waterproofing membrane installation
- Sloped mortar-bed installation
- Shower-floor tile installation
- Drain finishing and final detailing
The Transformation
Demolition Stage to Completed Floor


Project Progress
How the Work Came Together